999 Suwannee DR #Lot 1 Watersound, FL 32461 New

UPDATED: 03/13/2026 05:22 AM ON MARKET: 1 days on market

$1,001,920

4 Beds4 Baths2,750 SqFt

Key Details

Property Type Single Family Home

Sub Type Detached Single Family

Listing Status Active

Purchase Type For Sale

Square Footage 2,750 sqft

Price per Sqft $364

Subdivision Watersound Origins

MLS Listing ID 997852

Style Florida Cottage

Bedrooms 4

Full Baths 3

Half Baths 1

HOA Y/N Yes

Year Built 2026

Lot Dimensions 55'x130'x55'x130'

Property Sub-Type Detached Single Family

Source Emerald Coast Association of REALTORS®

Land Area 2750

Property Description

Welcome to the Macy by Huff Homes, located in the newly released Arborview Park phase of Watersound Origins, near the entrance of the community at West Bay Parkway and Highway 98. Situated on a corner homesite with a pond view, this two-story home offers approximately 2,750 square feet of living space with 4 bedrooms, 3 full bathrooms, a study, and a 2-car garage.

The first floor includes an open living, dining, and kitchen area that connects to a rear screened porch. The primary suite and a study are also located on the main level. Upstairs, three additional bedrooms are arranged around a central sitting area that can serve as a secondary living space or flex area. Interior features include 10-foot ceilings on the first floor and 9-foot ceilings upstairs, quartz countertops in the kitchen and bathrooms, luxury vinyl plank flooring throughout the main living areas, wood cabinets with soft-close drawers, upgraded stainless steel Bosch appliances, tiled showers in full bathrooms, and crown molding in the main living areas, hardwood stair treads, recessed lighting, ceiling fans.

Exterior construction includes cement fiber siding, decorative shutters, heirloom brick accents on the front and porches, and landscaped yard with irrigation.

Residents of Watersound Origins have access to the Origins Golf Course, Village Commons pool and fitness center, sports courts, trails, and the Watersound Town Center located within the community.

Estimated completion is end-June 2026.