1009 Suwannee DR #Lot 2 Watersound, FL 32461 New

UPDATED: 03/13/2026 05:23 AM ON MARKET: 1 days on market

$877,640

3 Beds3 Baths2,750 SqFt

Key Details

Property Type Single Family Home

Sub Type Detached Single Family

Listing Status Active

Purchase Type For Sale

Square Footage 2,750 sqft

Price per Sqft $319

Subdivision Watersound Origins

MLS Listing ID 997857

Style Florida Cottage

Bedrooms 3

Full Baths 2

Half Baths 1

HOA Y/N Yes

Year Built 2026

Lot Dimensions 55'x130'x55'x130'

Property Sub-Type Detached Single Family

Source Emerald Coast Association of REALTORS®

Land Area 2750

Property Description

Welcome to the Colt by Huff Homes, located in the newly released Arborview Park phase of Watersound Origins near the entrance of the community at West Bay Parkway and Highway 98. Situated on a homesite with a waterview, this single-level home offers approximately 1,610 square feet of living space with 3 bedrooms, 2 full baths, a half bath and a 2-car garage.

The floor plan features an open living, dining, and kitchen layout with direct access through french doors to a rear screened porch overlooking a retention pond. The primary suite is positioned privately at the rear of the home and includes a larger custom walk-in closet and private bath with tiled shower and quartz vanity. Two additional bedrooms and a full bath are located along the front hallway. Interior features include 10-foot ceilings, crown molding in main living areas, quartz countertops in kitchen and baths, upgraded stainless steel Bosch appliances with gas range complimented with an exhaust vent hood, luxury vinyl plank flooring throughout, and wood cabinetry with soft-close drawers.

Exterior construction includes cement fiber siding, heirloom brick porch accents, decorative shutters, and professional landscaping with irrigation.

Residents of Watersound Origins enjoy access to the Origins Golf Course, Village Commons pool and fitness center, sports courts, trails, and Watersound Town Center located within the community.

Estimated completion is: end-June 2026.