1029 Suwannee DR #Lot 4 Watersound, FL 32461 New

UPDATED: 03/13/2026 05:24 AM ON MARKET: 1 days on market

$887,640

3 Beds3 Baths1,960 SqFt

Key Details

Property Type Single Family Home

Sub Type Detached Single Family

Listing Status Active

Purchase Type For Sale

Square Footage 1,960 sqft

Price per Sqft $452

Subdivision Watersound Origins

MLS Listing ID 997861

Style Florida Cottage

Bedrooms 3

Full Baths 2

Half Baths 1

HOA Y/N Yes

Year Built 2026

Lot Dimensions 55'x130'x55'x130'

Property Sub-Type Detached Single Family

Source Emerald Coast Association of REALTORS®

Land Area 1960

Property Description

Welcome to the Brady by Huff Homes, located in the newly released Arborview Park phase of Watersound Origins, near the entrance of the community at West Bay Parkway and Highway 98. Situated on a corner homesite with a waterview, this single-level home offers approximately 2,090 square feet of living space with 3 bedrooms, 2.5 bathrooms, a study, and a 2-car garage.

The floor plan features an open living, dining, and kitchen layout with access to an expanded screened rear porch overlooking a retention pond. The primary suite is located privately at the rear of the home and includes a walk-in custom closet and a bath with a tiled shower and quartz vanity. Two additional bedrooms share a full bath, while the study near the front of the home provides flexible space for a home office or additional living area.

Interior features include 10-foot ceilings, crown molding in main living areas, quartz countertops in kitchen and bathrooms, upgraded stainless steel appliances, luxury vinyl plank flooring throughout, and wood cabinetry with soft-close drawers.

Exterior construction includes cement fiber siding, heirloom brick accents on the front and porch, decorative shutters, and professionally landscaped yard with irrigation.

Residents of Watersound Origins enjoy access to the Origins Golf Course, Village Commons pool and fitness center, sports courts, trails, and Watersound Town Center located within the community.

Estimated completion is: end-June 2026